3 tonne of structural steel in Dungeness. We marked out and installed the columns with resin anchors to the clients grid lines.
Our experienced steel erectors then installed the frame in two days using our mini crane and aluminium scaffold towers.
– Connection design & calculations
– 3D drawings for Client approval
– UKCA Approved Fabricated Steel
– Full Site Risk Assessments and Method Statements
– Qualified site erection team installing with Mini Crane
TitleDungeness 3 Tonne Steel FrameYear2025LocationDungeness