Split into 6 phases we fabricated, delivered and installed 116 tonne of structural steel to this huge excavated underground structure in Kent.
Using 2760 bolts we used the clients tower crane to erect with 3 of our experience steel erectors.
We also supplied & installed secondary steel such as handrails and window frames.
– Connection design & calculations
– 3D drawings for Client approval
– UKCA Approved Fabricated Steel
– Full Site Risk Assessments and Method Statements
– Top Flange unpainted steelwork
– Qualified site erection team
TitleChilham WineryYear2024LocationChilham