88 Tonnes of Structural Steel were added to the existing Sports Hall to create additional facilities,offices and changing rooms in Maidstone, Kent.
Connecting the new building to the existing one required accurate site measurements and our experienced site team to connect these intricate connections with out any disruption within the existing sports hall.
Good preparation and teamwork ensured a smooth erection and completion of this project on time.
Our package also included the following services:
– Site Surveys
– Connection and / or Section Design
– 3D Drawings offered for Client approval
– UKCA Approved Fabricated Steel
– Full Site Risk Assessments and Method Statements
– Crane Lift Plan by Inhouse Crane Appointed persons
– Crane And Mobile Access Supplied
– Qualified Site erection team
TitleStructural Steel for existing Sports HallYear2024LocationMaidstone, Kent