Cook Fabrications were excited to be involved with the regeneration works carried out on the historic Folkestone Harbour site in 2017-18. Our main works comprised the fabrication and installation of 4No bespoke station platform extension canopies that tied into the existing structures.
The Historic Double Railway Line Swing Bridge required a multitude of structural steel and welded plate repairs together with the introduction of new support steel and steel walkway decking to create the public walking route it has now become to access the Historic Harbour Station
TitleFolkestone HarbourYear2017LocationFolkestone, KentProject Size£500,000